Project OverviewThe proposed path would extend approximately 3.25 miles between the Doug Crane Boat Ramp and the Moultrie Boat Ramp. It would consist of a 5-foot-wide sidewalk within the County-managed Shore Drive Waterfront Park, constructed with asphalt paving and permeable asphalt in designated areas, along with boardwalks in environmentally sensitive locations. The design prioritizes minimal disturbance to existing vegetation, drainage patterns, and historically significant resources.
The results of this survey will be shared with the Board of County Commissioners and will help inform their decision on whether to proceed with the project. We ask both St. Augustine South and other interested County residents to complete this short survey and indicate their position. Please limit responses to one (1) per household.
View the plans.