Check SCREEN READER MODE to make this survey compatible with screen readers.
FM 973 Project Open House Comment Form - Proyecto FM 973 Reunión Comunitaria Formulario de Comentarios
The Capital Area Metropolitan Planning Organization (CAMPO) and the Texas Department of Transportation (TxDOT) are proposing to widen FM 973 from Samsung Highway to US 79 in Taylor to address rapid growth in the area.
FM 973 serves as a critical arterial route between Travis County and Williamson County and connects the growing cities of Manor and Taylor. CAMPO and TxDOT are proposing improvements because there is a need to improve mobility and reduce congestion along FM 973 from Samsung Highway to US 79. Existing conditions should be updated to accommodate projected traffic volumes and travel patterns.
CAMPO and TxDOT are proposing to widen the existing two- to three-lane facility to a six-lane boulevard section within existing right of way. The project will include an analysis of current and projected traffic volumes, existing and future land use, crash hotspots, environmental features, and needs and concerns identified by stakeholders and the public.