Community Survey
USD 107 Rock Hills Bond

Disclaimer: You’ll notice that the HVAC line item cost hasn’t changed from the previous proposal. The total still includes the same percentages for architectural and engineering (A/E) services, construction management fees and profit, and contingency. Much of the overhead cost remains the same, even when the project scope is reduced, which is why the overall HVAC cost did not decrease.
1.Which of these titles best describes you?(Required.)
2.Which age range do you fall under?(Required.)
3.How likely are you to vote in a special bond election this Spring (2026)?(Required.)
4.In the Spring, how likely are you to support a $5.67M bond election?

This would include new HVAC at the Jr/Sr High School and amount to a 7.8 mill increase. See breakdown below.
(Required.)
$5.67M Bond Option Breakdown:
5.In the Spring, how likely are you to support a $7.16M bond election?

This would include new HVAC at the Jr/Sr High School and secure entries at both schools. It would amount to a 9.7 mill increase. See breakdown below.
(Required.)
$7.16M Bond Option Breakdown: