Thank you for participating in the development of the Meridian Road Corridor Study and reviewing the proposed strategies to build a connected, safe, and multimodal corridor for the residents of Mesa, Apache Junction, Maricopa County, and Pinal County. The strategies include improvements to existing corridor segments and plans for new roadway segments, including alignment alternatives for a new connection between Baseline Avenue and Guadalupe Road. Your comments will be included, along with other considerations (utilities, cost, land acquisition, future development, etc.), in the development of the final recommended alignment.
Things to Know as You Complete This Survey
  • Right-of-Way (ROW): Land that a government or agency owns or has the legal right to use for transportation purposes, such as building, widening, or maintaining a road.
  • Fissures Defined: Cracks or openings in the ground caused by soil settling or earth movement. These can affect road stability and drainage if not addressed during design.
  • Measurement Key: On project maps, the symbol ' means feet (for example, 50' = 50 feet).
Comments will be accepted through November 8, 2025.
North of Southern Avenue

The proposed strategy includes widening the roadway to provide two lanes in each direction, a center turn lane, bike lanes, and sidewalks.

Question Title

* 1. Provide Feedback on the Two-Lane Strategy:

Question Title

Image
 
14% of survey complete.

T