Thank you for taking this survey. The Fayette Transportation Plan will establish county-wide goals, needs, and priorities for local transportation projects. It will also create a framework for a master path system that will balance the needs of pedestrians, bicyclists, and golf cart users. An initial step in the project includes conducting an existing conditions analysis. Your comments will remain anonymous, but will be aggregated to inform the project team about the issues that are important to the public.

* 1. What is your favorite / the best thing about the transportation system in Fayette County?

* 2. Rate the CONDITION of each transportation system in Fayette County (e.g., are roads full of potholes, do signals work properly?)

Rate each 1 to 5 where 1 is excellent, 3 is average, and 5 is terrible

  1 2 3 4 5
Pavement
Sidewalks
Multi-use paths
Bicycle facilities (on-road, paths, designated routes, bike racks)
Signs & signals (traffic lights, directional, etc.)

* 3. Rate the AVAILABILITY of each transportation system in Fayette County (e.g., are there enough bike lanes, sidewalks, or cross walks, traffic lights where needed for safety or easing congestion?).

Rate each 1 to 5 where 1 is excellent, 3 is average, and 5 is terrible

  1 2 3 4 5
Roads and streets
Sidewalks
Multi-use paths
Bicycle facilities (on-road, paths, designated routes, bike racks)
Signs & signals (traffic lights, directional, etc.)

* 4. What are Fayette County’s THREE biggest transportation CHALLENGES over the next 25 years?

* 5. Besides the intersections of SR 54 & SR 74 in Peachtree City, and SR 85 & SR 54 in Fayetteville, name any other specific areas/roads/intersections with traffic congestion.

* 6. Name any specific areas that have safety concerns (e.g. poor lighting, limited sight distance, lots of crashes, difficult for pedestrians to cross, etc.).

* 7. Where are any gaps in the existing path network and/or sidewalks (e.g. dirt paths on the side of the road where people walk)?

* 8. What is your primary mode of transportation to work?

* 9. In miles, how long is your commute one-way?

* 10. What is your primary mode of transportation around your community for non-work related trips (e.g., Grocery, Dr. Office, and Library)?

* 14. Which THREE of the following would be your highest priorities for transportation improvements?

* 15. Which areas or destinations would you like to travel to on a path that don't currently have a path connection?

* 16. What specific changes would you recommend to improve the quality of transportation in Fayette county?

* 17. Please rate the following items by their importance for consideration when SELECTING transportation projects.  

Rate each 1 to 5 where 1 is most important, 3 is average, and 5 is least important

  1 2 3 4 5
Conservation of natural environment
Reduction of air pollution (ozone, greenhouse gases, etc.)
Supports infill development in existing corridors
Improves travel choices
Improves connectivity between different communities within the county
Cost vs. benefits of the project (bang for the buck)
Minimize impacts on existing neighborhoods
Supports recreation options for paths, trails, and bike lanes
Supports economic development through recreational use
Supports new development
Reduces congestion
Improves freight movement
Improves travel time reliability
Safety

* 20. What is the zip code where you work?

* 21. Please select your age range 

* 22. If you would like to be added to our mailing list about the project, please enter your e-mail address here:

* 23. This space is for any other comment you would like to leave.

* 24. If an AVPRIDE student asked you to complete this survey, please provide their name.

T