Witherspoon Street Concept Survey Question Title * 1. Please rank the Witherspoon Street concepts A through E between Nassau Street and Hulfish Street in priority from 1 to 5 with 1 being the most desirable and 5 being the least desirable. 1 2 3 4 5 A. One-way NB 27 to Spring with one parking/loading lane (COVID Pilot) 1 2 3 4 5 B. One-way NB 27 to Spring with two parking/loading lanes 1 2 3 4 5 C. Closed to motor vehicles 1 2 3 4 5 D. Two-way with one parking/loading lane 1 2 3 4 5 E. Two-way with two parking/loading lanes OK DONE