Question Title

* 1. To properly install the MOM600 raft cylinder:

Question Title

* 2. The raft knife is installed on the same lifeline as the mooring line.

Question Title

* 3. The 3 MOM600 sea anchors are folded up and secured with what?

Question Title

* 4. The MOM600 Folding Procedure is drawing S-3621.

Question Title

* 5. If the MOM600 raft includes a pylon,

Question Title

* 6. When folding the MOM600 raft, the sea anchors must be positioned so that they are not folded.

Question Title

* 7. When placing the MOM600 into the vacuum bag,

Question Title

* 8. 1. What is the size of the MOM600 packing fixture?

Question Title

* 9. How much air is removed from the vacuum bag?

Question Title

* 10. When placing the vacuum bag into the MOM600 case,

Question Title

* 11. To complete the packing of the MOM600,

Question Title

* 12. Name

T