Question Title

1. To properly install the MOM600 raft cylinder:

Question Title

2. The raft knife is installed on the same lifeline as the mooring line.

Question Title

3. The 3 MOM600 sea anchors are folded up and secured with what?

Question Title

4. The MOM600 Folding Procedure is drawing S-3621.

Question Title

5. If the MOM600 raft includes a pylon,

Question Title

6. When folding the MOM600 raft, the sea anchors must be positioned so that they are not folded.

Question Title

7. When placing the MOM600 into the vacuum bag,

Question Title

8. 1. What is the size of the MOM600 packing fixture?

Question Title

9. How much air is removed from the vacuum bag?

Question Title

10. When placing the vacuum bag into the MOM600 case,

Question Title

11. To complete the packing of the MOM600,

Question Title

12. Name

T