OUR HOMES. OUR VOICE.

Tysons Wastewater Project Outreach Survey of Vienna

Please respond to this survey as this project will affect you.
1.Is this the first you’ve heard of the Tysons Wastewater Force Main project?
2.Are you comfortable with the extent of information available and shared about the project?
3.Is your home one of the 321 homes on the path of the force main pipeline?
4.Is your home not on the path but in the general vicinity?
5.Please select the street name that your home is located on or is the nearest street on the path.
6.Have you heard that it is trenchless or open trench?
7.Is your home adjacent to one of the parks that will be open-cut trenched including stream crossings?
8.Are you aware that the path crosses Town of Vienna-owned land?
9.Are you aware Rt 7 construction at Tysons is trenchless to minimize impact to commuters?
10.Are you aware less disruptive trenchless was assessed as feasible for residential communities and parks, but open trenching chosen instead of trenchless?
11.Do you have doubts as to whether the project can provide for the critical need of first responders (firefighters, EMTs, law enforcement) to access our homes and help our families during an emergency throughout construction of the force main?
12.Are you aware that equipment will be visible above ground post-construction? One example: Minimum 8 feet tall aluminum vent pipe topped with screened cap on street corner at entrance of Westbriar Elementary School.
13.Are you aware that trees in the VDOT right-of-way (road medians, sidewalks, etc.) and parks will be removed? The current tree register identifies 302 numbered trees for removal along the route, including park corridors. In some cases, there is a notional replacement plan of nursery trees with a 1-inch trunk diameter.
14.Are you aware of which contractors are supporting this project? CDM Smith developed the design which Ulliman Schutte (USC) translated into construction planning and USC’s construction subcontractor is pending award (estimated November 2026).
15.Are you aware that cutting down trees could begin as early as November 2026 and the open trench construction to begin as early as January 2027?
16.Are you aware there is not a warranty to protect our private property? The county stated that damage occurring inside the VDOT right-of-way will be fixed by the county - such as, your mailbox is damaged by construction equipment.
17.Do you support this project without concerns (as is)?
18.Do you oppose this project if measurable, enforceable protections are not added and agreed-upon for our homes? Requires structural risk assessments concerning soil stability, settlement risk, and structural integrity of nearby homes resulting from open trench construction and long-term force main operations.
19.Do you oppose this project if all trees are removed from the VDOT right-of-way?
20.Do you want to be contacted about the project to discuss your questions or concerns?
21.Do you want to be included in weekly project updates?
22.Please enter your name and email if prefer to be contacted or receive status updates about this project. Optional
Prepared by a resident volunteer for community information awareness, discussion, and coordination. Project information is accessible from the May 2026 Invitation-to-Bid package and feedback from the Fairfax County Hunter Mill District and Department of Public Works and Environmental Services project management and engineers. This survey does not provide professional engineering or legal advice and reviewers should obtain qualified advice if making property-specific, legal or financial assessments and decisions. Participation in the survey is voluntary and anonymous. Contact information is optional and will be used to coordinate resident communications and provide project updates.