About This Survey
This survey focuses on the proposed design for Section B of the project, from Ellery St to Columbia St. Section B is considered a ‘quick build’ project, meaning the design can include pavement markings, signage, and flex-posts, but cannot include major construction, changes to the curb, or traffic signal installation. This section is planned for installation in 2026.
Please fill out this survey by May 22, 2026.
See below for a Project Map, including the limits of Section B.
