About This Survey
This survey focuses on Section C of Cambridge St, from Fulkerson St to Second St. Section C will be built using a combination of quick-build and partial construction methods. Quick-build includes the use of pavement markings, flex-posts, signage and precast concrete barriers. Partial construction includes paving, reconstruction of curbs, ramps sidewalks, and crossing islands.
This survey breaks down the Section C roll plan into manageable sub-sections. A full image of the roll plan and the legend are below.
