South Wairarapa District Council 2024-25 Enhanced Annual Plan Consultation |
The 2024-25 Enhanced Annual Plan consultation is open between 5 April and 5 May 2024.
Since the Council’s current Long-Term Plan (LTP) was written in 2021, the economic environment we operate in has shifted significantly. The increase in rates forecast in the LTP for 2024-25 was 10.97%. However, the costs of services the Council provides to the community have increased dramatically since then.
Since the Council’s current Long-Term Plan (LTP) was written in 2021, the economic environment we operate in has shifted significantly. The increase in rates forecast in the LTP for 2024-25 was 10.97%. However, the costs of services the Council provides to the community have increased dramatically since then.
As a result, for the 2024-25 year, Council is proposing a 15.3% increase total rates across the district.
To help Council determine what the next year looks like, we need your feedback on three specific consultation topics;
1. How much should we spend on operating and maintaining our water services?
2. How should we charge for water use?
3. How should we pay for the replacement of our assets?
More information on these proposals is available in the consultation document.