Survey of projects under Measure D

Please review the following list and select three (3) projects that are most important to you or suggest your own projects at the end of the list.  The listed projects are suggested by staff.  Number your highest priority as one (1), the second highest as two (2) and the third highest as three (3). 

1. Bicycle Safety - Greenway Route Program.  Provide additional signage and traffic markings along popular bicycle corridors to create safer cycling environment.

2. Downtown Revitalization - Improvements on Main Street from Freedom Blvd to Riverside Dr that address pedestrian crossings, bicycle lanes, bus stops, parking, sidewalks, landscape and traffic management.

3. Ease Congestion - Install roundabout at intersection of Main St and Freedom Blvd to improve traffic flow and reduce pollution.

4. Ease Congestion - Install roundabout at intersection of Pennsylvania Dr and Hammer Dr to improve traffic flow and reduce pollution.

5. Maintain Roads - Various Locations. Place three-layer coating system on road surface to preserve residential streets within the City.

6. Maintain Trails - Maintain and enhance existing pedestrian and bicycle trails at various locations.

7. Pedestrian Safety - Install sidewalk or path on Main St from Holm Rd to Green Valley Rd.

8. Repair Road - Freedom Blvd Repair from Alta Vista St to Davis St.  Repair and resurface damaged roadway and bike lanes, replace damaged sidewalk.

9. Repair Road - Freedom Blvd Repair from Green Valley Rd to Buena Vista Dr.  Repair and resurface damaged roadways and bike lanes, replace damaged sidewalks, add pedestrian facilities where none exist.

10. Safe Routes to School - Construct pedestrian and bike trail from Airport Blvd to Pajaro Valley High School.

11. Safe Routes to School - Install bicycle/pedestrian bridge and sidewalk on Harkins Slough Rd between Green Valley Road and Pajaro Valley High School entrance.

12. Traffic Safety - Reduce speeds and improve safety on Auto Center Drive from Main St to Marin St by installing traffic calming measures such as striping, markers, curb extensions and speed humps.

* 1. Priority #1

* 2. Priority #2

* 3. Priority #3

T