ELEMENTARY

Feedback Directions: Please score each category on a scale of zero to five. You may comment at the end of the ranking.

* 1. Elementary Deferred Maintenance Upgrades
  • Building envelope (cracks in masonry and flashing)
  • Hardscapes (parking lots, playgrounds, baseball field, concrete)
  • Kitchen (storage, cooking, and dishwasher)

  I love this upgrade. I will champion it. I strongly agree with this upgrade. The upgrade is okay with me. I am willing to go along. I have reservations and am not yet ready to support this upgrade. I am opposed to this upgrade. If I had the authority, I would veto this upgrade, regardless of the will of the board.
Deferred Maintenance Upgrades

* 2. Elementary Environmental Systems Upgrades
  • Automation of air handling and unit replacements
  • Air conditioning addition
  • Heating water system (replace 1966 boilers)
  • Replace 1966 exhaust fans
  • Plumbing (water heater, water softener, 1966 galvanized piping replacement)

  I love this upgrade. I will champion it. I strongly agree with this upgrade. The upgrade is okay with me. I am willing to go along. I have reservations and am not yet ready to support this upgrade. I am opposed to this upgrade. If I had the authority, I would veto this upgrade, regardless of the will of the board.
Environmental Systems Upgrades

* 3. Elementary Lighting and Electrical Upgrades
  • Interior and exterior lighting
  • Electrical distribution (three additional power receptacles per room, add a standby generator)

  I love this upgrade. I will champion it. I strongly agree with this upgrade. The upgrade is okay with me. I am willing to go along. I have reservations and am not yet ready to support this upgrade. I am opposed to this upgrade. If I had the authority, I would veto this upgrade, regardless of the will of the board.
Lighting and Electrical Upgrades

* 4. Elementary Technology Safety and Security Upgrades
  • Fire alarm system
  • Security camera expansion
  • PA, bell, and clock system replacement

  I love this upgrade. I will champion it. I strongly agree with this upgrade. The upgrade is okay with me. I am willing to go along. I have reservations and am not yet ready to support this upgrade. I am opposed to this upgrade. If I had the authority, I would veto this upgrade, regardless of the will of the board.
Technology Safety and Security Upgrades

* 5. Elementary Remodel Upgrades
  • Secure entrance and main office addition
  • Traffic circulation (new parent and bus loop traffic configuration requires relocation of baseball diamond to high school)
  • IMC remodel for 21st-century learning space
  • Corridor, classrooms, and restroom
  • Space enhancement
  • classroom size redistribution
  • second-floor additional classrooms (with main office addition)
  • grade level reorganization (Pre-K - 1 downstairs and 2-5 upstairs)
  • OT/PT improvement
  • ADA restroom installed

  I love this upgrade. I will champion it. I strongly agree with this upgrade. The upgrade is okay with me. I am willing to go along. I have reservations and am not yet ready to support this upgrade. I am opposed to this upgrade. If I had the authority, I would veto this upgrade, regardless of the will of the board.
Remodel Upgrades

T