Question Title

* 1. What is the inspection interval of the MOM600?

Question Title

* 2. How are the cylinders inspected?

Question Title

* 3. How is the light checked?

Question Title

* 4. What tests are required at every service interval?

Question Title

* 5. The Proof Test consists of:

Question Title

* 6. The Leakage Test consists of inflating the MOM600 devices to 2 psi for 1 hour.

Question Title

* 7. During a Timed Leak Test, what information should be recorded at the start and finish?

Question Title

* 8. If the room temperature or barometric pressure changed during the course of the Leakage Test, a Pressure-Temperature Correction must be calculated.

Question Title

* 9. Repair limitations on holes in the MOM600 devices include:

Question Title

* 10. Patches must cover at least 1” around the damaged area.

Question Title

* 11. When working with Urethane cement, the proper solvent to use is MEK.

Question Title

* 12. If the light doesn’t work, the batteries may be replaced.

T