These practice questions should be used by candidates to familiarize themselves with the format of questions that will appear on the IDPX exam. They should not be reproduced and utilized for any other purpose.

Question Title

* 1. What is included in the Management and Operations section of a business plan?

Question Title

* 2. Pre-programming and planning is required to develop what vital document for achieving successful project management?

Question Title

* 3. What is the MINIMUM width required for a bedroom that is 10 ft. [3.05 m] long?

Question Title

* 4. A client needs to move into their space as soon as it is substantially complete and the furniture is installed. What is the MOST important task for the contractor to complete?

Question Title

* 5. What documentation protects your client if the contractor, who is awarded a job through a formal process, is unable to commence work?

Question Title

* 6. Which of the following dye methods would be the BEST to withstand harsh cleaning solutions used in a medical office building?

Question Title

* 7. A designer working on a major office renovation has completed design development for the project. What is the sequence to proceed?

Question Title

* 8. A designer is finishing a basement for a client and her family that includes a game room, 3/4 bathroom, laundry room, a bedroom, and the mechanical room for the home. The overall unfinished ceiling height is 8'-6" (2590.8 mm) and the home is forced-air, wood frame construction built in the late 20th-century. What would be the MOST APPROPRIATE wall and ceiling construction assembly in the basement?

Question Title

* 9. The occupancy load threshold requiring an increase from two to three egress doors per story is:

Question Title

* 10. Construction documents generally undergo coordination review at which percentage of completion milestones?