1. Please read before taking the survey.The information below tells you how a criteria will be scored.

1.  Is the project within an LTE conservation plan primary or connecting corridor?  Yes: ________   1   Point
2.  Is the project connected to existing open space?  Yes: ________   1 Point
3.  What is the index score of the primary or connecting corridor as determined by the LTE conservation  plan? (4 is the highest index score, 7 is the lowest index score)
 Index score 4:________   4 Points; Index score 5:________   3 Points; Index score 6:________   2 Points;
Index Score 7:________   1 Point
4.  What local criteria, as designated in the LTE conservation plan, are in the project area?
Core Forest:  ________ 1 Point; Hydrology/Wetlands:  ________   1 Point; Early Successional Habitat: ________   1 Point;
Critical Habitat: ________   1 Point
5.  What is the total area of local criteria contained in the project area as designated in the LTE conservation plan? (Core Forest, Hydrology/Wetlands, Early Successional Habitat, and Critical Habitat)
                Points awarded by the number of projects being vetted.
                Example:  if there are four projects, then the project with the greatest area of local criteria would get 4 points. 
                The property with the least area of local criteria would get 1 point. The ones in between would get 2 or 3 accordingly.
6.  What is the size of the project area?
                Points awarded by the number of projects being vetted.
                Example:  if there are four projects, then the largest project would get 4 points.
                The smallest property would get 1 point.  The ones in between would get 2 or 3 accordingly.
7.  What is the price per acre?
                Points awarded by the number of projects being vetted.
                Example:  if there are four projects, then the project with the lowest cost per acre would get 4 points.
                The property with the highest cost per acre would get 1 point.  The ones in between would get 2 or 3 accordingly.
8.  Is the project an existing site for an endangered species or species of Greatest Concern?
                Yes: ________   1 Point
9.  Is the project located within a State Designated Greenway?
                Yes: ________ 1 Point
10.  Does the project have historic significance?
                Yes: ________ 1 Point
11.  Will the property be accessible to the public?
                Yes: _______ 1 Point
12.  Does the project provide a viewshed either looking out from the project or looking into the   
       project area from a public viewing location?
                Yes: _______ 1 Point
13.  Are there Prime Agricultural Soils located within the project boundary?
                Yes: ________   1 Point
14.  Is it a multi-town project?
                Yes: ________ 1 Point          
15.  Do municipal planning documents include the project in an area for open space protection?
                Yes: ________ 1 Point
16. Is it suitable for education or scientific purposes?
               
Yes: ________   1 Point
17.  Are there any site concerns from historic property usage?
               
No: _______ 1 Point
18.  Does it have pending development applications or approvals?
                Yes:______ 1 Point

T