Skip to content
CMH-17 Fall 2026 Coordination Meeting Survey
Please share your feedback regarding our recent meeting. We appreciate your candid responses.
Filling out this survey has the ability to enter you into a random drawing for $100 off your Spring 2027 Coordination Registration.
*
1.
Are you wanting to participate in the raffle?
(Required.)
Yes - Please include my name in the raffle
No - I do not want to participate in the raffle
____________________________________________________________________________________________________________________________
2.
Overall, how productive do you think the meeting as a whole was?
Very productive
Somewhat productive
Neither productive nor unproductive
Somewhat unproductive
Very unproductive
3.
Do you have any comments regarding meeting productivity?
4.
How comfortable did you feel sharing your opinions, comments, or volunteer to participate in the meeting?
Very comfortable
Somewhat comfortable
Neither comfortable nor uncomfortable
Somewhat uncomfortable
Very uncomfortable
5.
Please share with us why you feel that way about speaking up during the meeting.
6.
Do you have any additional feedback for the organizer of the meeting (Secretariat)?
____________________________________________________________________________________________________________________________
7.
How did you feel about Opening Coordination length?
Too short
About the right length
Too long
8.
How did you feel about Closing Coordination length?
Too short
About the right length
Too long
____________________________________________________________________________________________________________________________
9.
If you attended the learning opportunities, please tell us your opinions on them
Length of Session
Session Content
Content Organization
Thermoplastics Initiative Forum
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Surface Preparation for Bonding Mini-Tutorial
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
AI and Machine Learning for Composites and Advanced Materials
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Composites Repair Panel
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Radome Repair Case Study Review
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Resin Transfer Molding Mini-Tutorial
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Very Satisfied
Somewhat Satisfied
Somewhat Dissatisfied
Very Dissatisfied
Comments
10.
If you attended our Working and Task Group sessions, please provide feedback on the sessions you attended
Session organization
Session length
Could you participate in the session if you wanted to?
Would you recommend this working group to others?
Sandwich Working Group (Mon 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Engine Applications Working Group (Mon 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Data Review (Mon 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Testing (Mon 11 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Interiors (Mon 11 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Design (Tues 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Crashworthiness (Tues 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Spacecraft (Wed 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Sandwich TG 3: Design + Analysis (Wed 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
AM Guidelines (Wed 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Bonding Process TG (Wed 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
AM Materials + Processes (Wed 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Supportability (Wed 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Damage Tolerance (Wed 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Statistics Task Groups (Wed 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Statistics Working Group (Wed 11 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Sandwich TG 4: Damage Tolerance (Thurs 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
AM Design + Analysis (Thurs 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC Materials + Processes (Thurs 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
AM Testing (Thurs 11 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
PMC P17 Task Group (Thurs 11 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Joint Guidelines (Fri 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Sandwich TG 5: Supportability (Fri 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
CMC Testing (Fri 7 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Supportability TG's (Fri 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Sandwich TG 2: M&P (Fri 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
CMC Design + Analysis (Fri 8 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Modernizing Material Equivalency TG (Fri 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
Sandwich TG 1: Testing (Fri 10 AM PST)
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Very Satisfied
Satisfied
Dissatisfied
Very Dissatisfied
Yes
No
Yes
No
If you provide comments, please include the name of the session you are providing comments on.
11.
Are you interested in joining any of our Working or Task Groups
Joint - Guidelines
Modernizing Material Equivalency TG
Joint - Interiors
Joint - Engine Applications
Joint - Spacecraft
Joint - Statistics
Statistics TG - Statistical Process Control
Statistics TG - Equivalency
AM - Data Review
AM - Design + Analysis
AM - Guidelines
AM - Materials + Processes
AM - Testing
CMC - Materials + Processes
CMC - Testing
CMC - Design + Analysis
CMC - Data Review
PMC - Data Review
PMC - Design + Analysis
PMC - Durability + Damage Tolerance
PMC - Guidelines
Thermoplastics Task Group
PMC - Materials + Processes
Bonding Process Task Group
P-17 Task Group
PMC - Safety Management
PMC - Sandwich Working Group
Sandwich TG 1: Testing
Sandwich TG 2: M&P
Sandwich TG 3: Design
Sandwich TG 4: Damage Tolerance
Sandwich TG 5: Supportability
PMC - Supportability
Supportability TG 1: Service Experience
Supportability TG 5: Radome Repair
PMC - Testing
None of the above