Question Title

1. Do you favor further study of the Cut-and-cover tunnel option under SW 53rd from Barbur to PCC Sylvania (and on to the Tigard Triangle)?

Question Title

2. Do you favor further study of the new bored tunnel option under SW 53rd?

Question Title

3. Do you favor further study of constructing only the west half of the PCC Tunnel from the underground station at PCC to the Tigard Triangle?

Question Title

4. Do you feel the current level of development at PCC supports investment in a tunnel to provide direct access to the campus?

Question Title

5. Should Metro continue to study the BRT option along Capitol Hwy. and 49th from Barbur to PCC Sylvania (and on to the Tigard Triangle)?

Question Title

6. Should TriMet develop an Express Bus from downtown Portland direct to PCC Sylvania?

Question Title

7. Do you favor the BRT or LRT option along Barbur Blvd. for HCT?

Question Title

8. Should Metro continue with plans for a High Capacity Transit Corridor?

Question Title

9. See pg. 11 of the PCC Sylvania LRT Connection Options. Please check all options you favor.

Question Title

10. See pg. 12 and 13 of same report. Please check all options you favor.

Question Title

11. Do you favor a Neighborhood Greenway project along 53rd (SIS project #6013)?

Question Title

12. How did you hear about this meeting (please check all that apply)?

Question Title

13. Please write your comments and/or questions for Metro here:

T