Electric Vehicle Charging Station Survey

The Ecology Commission of CSCD has been approached about the feasibility of installing a Level 2 Electric Vehicle Charger somewhere within CSCD – as the nearest public chargers are approximately 30 minutes away. (Note: A Level 2 Charger will add approximately 15-30 miles of battery range per charging hour.) If installed, the intent would be for a public charger to be open to residents and guests for a charging fee – with the revenue generated going to CSCD. The initial sunk cost will be in the $15,000-$20,000 range from the CSCD budget and annual $500 fee to CSCD operating expenses. The annual revenue generated for CSCD would be in the $3,500-$4,500 range. The project would payout over 5 years with approximately 1 charge per day.

*For those that don't have EV's and are not familiar with the charging process, having a
public charger installed would make the CSCD EV charger station "discoverable" on a public EV Map phone app so that anyone, even from outside our area (meaning not being a resident or invited guest) could locate the charger and come in to use it.*
An important question the Committee has asked is whether an EV Charger would get enough utilization within the Conservancy. Accordingly, we’re hoping you can take a moment to complete the following brief Electric Vehicle survey.
1.Do you own or use an electric vehicle (or plug-in hybrid)?
2.Have any of your family or guests driven an Electric Vehicle to the lakes?
3.If your answer is NO on question 2, do you anticipate purchasing or leasing an EV in the next 1-3 years?
4.Do you believe you or your guests would utilize an EV Charger if it were located within CSCD?
5.If you answered yes to question 4, how many times per year would you or your guests utilize a charger? (Estimated #)
6.Other Comments (e.g. Potential location within CSCD? Other EV Charger thoughts?)
7.If you currently own an EV, do you have an EV charger at your CSCD residence?
8.If you currently own an EV, approximately how many days per year are you at your CSCD residence? (Estimated # of days)