Question Title

* 1. Please provide your contact information for potential follow up questions from City staff.

Question Title

* 2. Does your property or the roadway adjacent to your property, have any drainage/stormwater issues?

Question Title

* 3. If you selected "yes" to stormwater drainage issues in the previous question, please answer the following questions:

Question Title

* 4. Optional private storm sewer connections will be included with this project, as needed. They connect an existing underground private storm service from your home, typically from a downspout or sump pump, to the public storm water system and can help move storm water away from your home.  The connection from the public storm sewer would be provided to the property line, and this work is assessable.

Would you be interested in a private storm sewer connection?

(Please contact Lauren Striegl at LStriegl@cityofmadison.com for more information)

Question Title

* 5. Are there any items adjacent to or within the public right-of-way that we should be aware of prior to starting construction?  Please keep in mind that if you want to save any special improvements within the right-of-way, such as landscaping, pavers, invisible fencing, sprinklers, etc., you will need to remove these items prior to construction.

Question Title

* 6. Terrace Rain Gardens help reduce stormwater runoff and improve water quality. Some terraces along Cedar St. may be suitable for a terrace rain garden. Eligible terraces should meet the following criteria: minimum area of 10’ X 15’ in a relatively flat, open space away from trees, utilities, and driveways. If your terrace is eligible would you be interested in having a terrace rain garden installed with the project at a cost to you of $100? Installation with the project would include all grading, the initial planting (several planting plan options are possible), and placement of mulch. You can learn more about our Rain Garden program at: www.cityofmadison.com/TerraceRainGardens

Question Title

* 7. If you selected "Yes" to interest in the terrace rain garden, what factors influenced your decision? (check all that apply)

Question Title

* 8. If you selected "no," what factors influenced your decision? (check all that apply)

Question Title

* 9. The City has received a request for additional traffic calming on Cedar St.  The City has a general traffic calming process, but since this work could be coordinated with a reconstruction project, we will consider installing speed humps on Cedar St. and a traffic circle at the Cedar St/Hickory St intersection, if there is interest from the neighborhood.  Locations of the traffic calming measures are shown on the preliminary plan on the project website. Are you supportive of traffic calming measures installed along Cedar St.?

Question Title

* 10. Any other issues or concerns related to the project that you would like to share with us?