Skip to content
OA Daily Ropes Checklist 2025
*
1.
Person Filling out Checklist
(Required.)
Amy Hilburn
Alexa Bill
Jared Blackburn
Justin Bartle
Kyle German
Lauren Briscoe
Peyton Tillman
Marty Wehner
Thomas Tokos
Other (please specify)
S.E.E. Inspection Reminders
Structure
- the element itself (cables, pole, trees, JRDs. etc...) appears safe and secure.
Equipment
- ropes, knots, SRD, harnesses, helmets, ladders
Environment
- no dead tree branches overhead, pests, etc...
*
2.
The following elements were...
- Set up,
- Checked by 2 staff, and
- 100% Ready to be used Today.
(Required.)
Yes
N/A today
NO (don't open)
Archery
Each Range has...
- 4 bows
- 2 targets
- 3 quivers w. 3 arrows
- Rope on ground
Yes
N/A today
NO (don't open)
Slingshots
- 3 slingshots
- 3 stands with 4 pellets each
- Targets set up (hanging and resting)
- Rope on ground
Yes
N/A today
NO (don't open)
Cargo Net / Crate'r Mtn
- Knots correct
- Rope through SRD correctly
- JRDs set correctly
- Helmets, Seat AND Chest Harnesses
Yes
N/A today
NO (don't open)
Giant Swing 1
- Knot correct
- Rope through pulleys correctly
- Hardware and Halyard Hitch correct
- Helmets, Seat AND Chest Harnesses
- Carabiner attached to swing cable
- Ladder set up on platform
Yes
N/A today
NO (don't open)
Giant Swing 2
- Knot correct
- Rope through pulleys correctly
- Hardware and Halyard Hitch correct
- Helmets, Seat AND Chest Harnesses
- Carabiner attached to swing cable
- Ladder set up on platform
Yes
N/A today
NO (don't open)
Power Pole
- Knot correct
- Rope through SRD correctly
- JRD set correctly
- Ladder Tie on Ladder
- Helmets, Seat AND Chest Harnesses
Yes
N/A today
NO (don't open)
Double Power Pole
- Knot correct
- Rope through SRD correctly
- JRD set correctly
- Ladder Tie on Ladder
- Helmets, Seat AND Chest Harnesses
Yes
N/A today
NO (don't open)
Tree Throw 1
- Knot correct
- Rope through SRD correctly
- JRD set correctly
- Ladder Tie on Ladder
- Basket of Balls attached
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
Tree Throw 2
- Knot correct
- Rope through SRD correctly
- JRD set correctly
- Ladder Tie on Ladder
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
Leap of Faith 2 / Tree Climb
- Knot correct
- Rope through SRD correctly
- JRD set correctly
- Ladder Tie on Ladder
- Helmets, Seat AND Chest Harnesses
Yes
N/A today
NO (don't open)
Wopper Plopper
- Stairs lowered to ground
- C-Hooks AND Jake Carabiners
- Helmets, Seat AND Chest Harnesses
- Ground exit ready for plopping
- Cycled
Yes
N/A today
NO (don't open)
Lil' Swing
- Ropes not twisted in 4-1 system
- Redirect at bottom of tree
- Seats, carabiners, and cable attached
- Rope Boundary Line attached
- Ladders set up on platform
- All screw gates/maillons screwed down
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
VP2
- Rope ladders lowered
- Knots correct
- Ropes through SRD's correctly
- JRD's set correctly
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
Double Zip Line
- Net lowered to ground
- Participant lanyards on entry cable
- Zip trolleys on stand
- Rescue bag and 2 lanyards up top
- Visually inspect cables from ground
- Harnesses and Helmets
- Both zip cables cycled
Yes
N/A today
NO (don't open)
Climbing Tower A
- Knots correct
- Ropes through SRD's correctly
- JRD's set correctly
- Removable holds on wall
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
Woods Rescue Bag
- Clipped to metal eyebolt under Tower A
Yes
N/A today
NO (don't open)
Jacobs Ladder
- Rope ladders lowered
- Knots correct
- Ropes through SRDs correctly
- JRDs set correctly
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
VP1
- Rope Ladders lowered & connected to ground
- Knots correct
- Ropes through SRDs correctly
- JRDs set correctly
- Helmets, Seat Harnesses
Yes
N/A today
NO (don't open)
Triple Zip Line
- Net lowered and hooked over staple
- Participant lanyards on entry cable
- Zip trolleys on tarp
- Rescue Bag and 3 lanyards up top
- Radio on top ready
- Visually inspect cables from ground
- Helmets, Seat Harnesses
- All zip cables cycled
Yes
N/A today
NO (don't open)
Zorb
- 2 Balls and 2 marshmallows fully inflated
- Balls and marshmallows secured to posts
- Water hose ready for use
Yes
N/A today
NO (don't open)
TEC Course
- Net lowered to ground
- Both Rescue Bags present
- Visually inspect top and cables
- Helmets, Participant Claws, and Seat Harnesses
Yes
N/A today
NO (don't open)
Flying Squirrel
- Knot correct
- butterfly on participant side
- Rope through both pulleys correctly
- Mule belay w. 4 carabiners
- Measure length with bag 2/3 of way to cable
- Rescue bag, pole steps, AND cable grab set
- Seat and Chest Harnesses, and Helmets
Yes
N/A today
NO (don't open)
DEUS
- Pole steps on DEUS pole
- cable grab up top on cable at exit
- DEUS set up correctly
- Knots correct
- Cycled
Yes
N/A today
NO (don't open)
Laser Tag
- First set of taggers fully charged
- New taggers plugged in
- Tarps set on stands
Yes
N/A today
NO (don't open)
Double Zip Cycled?
Yes
N/A today
NO (don't open)
Triple Zip Cycled?
Yes
N/A today
NO (don't open)
Wopper Plopper Cycled?
Yes
N/A today
NO (don't open)
3.
Was Trip Zip Cycled? If so, what were the cable belly measurements? Cable 1: furthest from church, 2: middle cable, 3: closest to church.
4.
Items that had to be corrected with set-up during this check:
(I had to adjust these items during set up - knots, harness set up, etc..)
5.
Action Items that need to be addressed on the course:
(Things I can't adjust right now, but need to be repaired, etc...)
*
6.
Signature
By typing my name, I acknowledge that 2 people checked each high element and a S.E.E. Inspection was completed on each.
(Required.)