Process Audits - Printing

Some of the questions below would need to be confirmed on ERP 
1.Auditor's Name
2.Work Area/ Machine
3.Operator's Name
4.QC Inspector's Name
5.JOB Number
6.Operator. Is the JOB ticket at the machine/ work area?
7.Is the sample and/or proof available in JOB ticket?
8.Is the color standard for reference?
9.Is the vinyl available at the machine?
10.Is Non-conforming material properly identified? (Spray and WIP Tag)
11.Is non-conforming material properly documented on report and ERP?
12.Is the light properly use for QC inspection and release?
13.Are pull out and shingles performed by operator?
14.Is color standard sign by operator?
15.Is waste documented by operator?
16.QC. Is First piece inspection properly performed for current JOB?
17.Is color standard and signed?
18.Is 15 minutes sampling performed properly?
19.Cutting Aerator. Is Non-conforming material properly segregated?
20.QC. Are inspections for aerator being performed?