1. Your Feedback is Important!

Thank you for taking the time to participate in this survey. Your responses will be used to guide the efforts of the Flood Mitigation Study and validate our models of historic damages. Your responses will be kept anonymous. 




Definitions: 

Project Team
The project team includes members of Crandall Engineering Ltd., IBI Group and the City of Moncton.

Flood Mitigation:  Methods of reducing the effects of floods. These methods may be structural (temporary and permanent barriers, flood storage facilities, etc.) or non-structural (emergency response plan, land use policy and regulations, etc.).

Property-Level Mitigation: Homeowner installed improvements to reduce or eliminate the impacts of flooding damage on their own property. 

Models of Historic Damages: A "Flood Damage Assessment Model" that was developed to determine theoretical property damages resulting from flooding. 


T