ANSI Z9.5 survey Question Title * 1. Is your site/facility considered an academic (University, College), public (Government) or private company? Academic Government Private Question Title * 2. What is your primary role or responsibility? Architect, Design Engineer, Consultant Health, Safety, Environment Facility Operations, Engineering, Maintenance Research or Scientific Operations Other Question Title * 3. 3. How many fume hoods are onsite, or part of your organizational oversite. 1-50 50-100 100-200 200-500 500+ Question Title * 4. What percentage of the fume hoods are Variable Air Volume vs Constant Volume (total should equal 100%) CAV VAV Question Title * 5. What percentage of your labs are chemistry, biology, or analytical sciences based (total should equal 100%) Chemistry Biology Analytical Science Other Question Title * 6. Do you have a prescribed minimum airflow (CFM, ft3/min) for the fume hood based on the fume hood type/size, i.e. a 6 foot VAV hood is set a 250 ft3/min as its minimum airflow. If so, what are the values? No, there is no standard set value Yes, but don’t know the values Yes, 4 foot hood value is... Yes, 5 foot hood value is... Yes, 6 foot hood value is... Question Title * 7. Do you have a prescribed minimum airflow based on the previous NFPA guidance of 25 CFM/ft2 of fume hood work surface, or some other established value? Yes, we use(d) the original NFPA value of 25CFM/ft2 of work surface No, we use(d) our own prescribed value of... Question Title * 8. Do you plan on, or have you already implemented the revised Z9.5-2012 Guidance for setting the minimum airflows based on interior fume hood air change rates (ACH), or the equivalent work surface rate (CFM/ft2)? No plans to change Yes, we plan on implementing the change, but have not yet made the change Yes, we have made the change Question Title * 9. If you are planning on, or have already made the change as per question #6, what are the established air change rates, or the equivalent work surface rate (CFM/ft2)? We are using an ACH of... We are using an equivalent work surface rate (CFM/ft2) of... Question Title * 10. Has your site’s Safety or Compliance office, or Health, Safety and Environment team been involved in your plans to establish a new minimum flow for the fume hoods based on the revised standard? Yes Yes, and a hazard assessment was completed No No, and there are no plans to make any changes Question Title * 11. Any comments you would like to share? Question Title * 12. If you're interested in a getting a copy of the results of this survey, please give us your e-mail address below. Done