Introduction

 
5% of survey complete.
The Township of Alnwick/Haldimand is developing a Master Plan to guide municipal investment in parks and recreation over the next 20 years. The plan consists of 3 projects:

  • Project 1: An assessment of the Township’s community centres and libraries to determine the level of investment required in these buildings over the long-term.
  • Project 2:  An Arena Feasibility Study to evaluate the sustainability of the existing arena against the options to renovate or replace this asset over time.
  • Project 3: A playing Fields, Parks, Boat Launch and Trails Feasibility Study to determine opportunities to enhance the Township’s open space network.


Your input is important to ensure the Master Plan reflects the needs of residents. What do you think are the current and future priorities for parks, recreation and culture in the Township?

This survey will be closed on December 8, 2017.

Your responses are considered CONFIDENTIAL – no individual respondents will be identified publicly through the results. This survey should take about 10-15 minutes of your time.  Thank you!

T