Question Title

1. Which of the following is not true about the role of the Lead Designer? (Required.)

Question Title

2. Whose responsibility might be creating a Design Responsibility Matrix at the beginning of Stage 02 - Concept Design? (Required.)

Question Title

3. Which two of the following is not true of the function of the Contract Administrator? (Required.)

Question Title

4. Which of the following is not a role and responsibility of the Contract Administrator? (Required.)

Question Title

5. Which of the following is not a typical reason for issuing an Architect's Instruction? (Required.)

T