Skatepark Update Survey (Fall 2024)

Necessary Info

This survey refers to the two sides of the park as Olliewood 1 (Side to the left of the shop with box jumps, mini ramp, and pizza slice) and Olliewood 2.0 (side to the right of the shop with wedges, a frame ledge and 3ft quarter).
1.On the Olliewood 1.0 side of the skatepark select the two areas of the park that you want to see changed.
2.If we change any of these areas on Olliewood 1.0 what would you like to see added to the park? (select the 8 choices that you want to see added most to Olliewood 1.0)
3.On the Olliewood 2.0 side of the skatepark select the obstacles that you want to see changed.
4.If we update Olliewood 2.0 how drastic do you want the change to be?
5.If we make changes to Olliewood 2.0 what would you like to see added? (select the 8 choices that you want to see added most to Olliewood 2.0)
6.Regarding Live Music: Our all ages live shows have been a consistent source of revenue and exposure for the park. Do you have an issue with adding 1 monthly live music show to our schedule? This involves using an obstacle in the park as a stage and making it off limits to skating/riding for the evening of the live show (Possible using the entire 2.0 side for shows from 4pm-10pm on 1 Saturday per month).