Reliability Plan Survey

Here are 16 common tasks added to reliability program plans. 

We are interested in how important each item typically is for you when building and executing a plan. We will share the results in a future podcast and article.

Question Title

* 1. Rank order the 16 items across the full scale. 1 is MOST important and 16 is LEAST important

  Most Important  1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Least Important  16
Develop and implement burn-in
Follow derating and stress/strength guidelines during design
Generate/confirm operating use profiles
Define system, subsystem and component level reliability requirements
Develop a system reliability model
Develop Reliablity Centered Maintenance (RCM) plan
Identify and execute robust design projects
Implement ongoing management reviews (e.g. via FRACAS)
Conduct Highly Accelerated Life Test (HALT)
Conduct reliability demonstration test
Perform design margins analysis
Ensure supplier reliability for critical components
Perform FMEA for system, subsystems and critical components
Develop and implement environmental stress screening
Implement reliability growth testing
Implement design or manufacturing and design for serviceability

T