Reliability Plan Survey

Here are 16 common tasks added to reliability program plans. 

We are interested in how important each item typically is for you when building and executing a plan. We will share the results in a future podcast and article.

Question Title

* 1. Rank order the 16 items across the full scale. 1 is MOST important and 16 is LEAST important

  Most Important  1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Least Important  16
Conduct reliability demonstration test
Conduct Highly Accelerated Life Test (HALT)
Develop and implement burn-in
Ensure supplier reliability for critical components
Perform design margins analysis
Develop Reliablity Centered Maintenance (RCM) plan
Implement reliability growth testing
Identify and execute robust design projects
Develop a system reliability model
Develop and implement environmental stress screening
Perform FMEA for system, subsystems and critical components
Generate/confirm operating use profiles
Define system, subsystem and component level reliability requirements
Implement ongoing management reviews (e.g. via FRACAS)
Follow derating and stress/strength guidelines during design
Implement design or manufacturing and design for serviceability

T