Location:
DMG Reno
1900 S McCarran Blvd #240
Reno, NV 89502

Date:
October 28, 2026
8 am - 3 pm
Cost: Free

The manufacturer’s guidelines for installing the piping and wiring systems connected to the indoor and outdoor LG Multi V air conditioning.

What We’re Covering:
Pre-Installation Considerations
Indoor & Outdoor Unit Overview
Heat Recovery
Refrigeration Piping
Wiring
Controls Overview
Pre-Commissioning

Question Title

1. Full Name (Required.)

Question Title

2. Company or Organization (Required.)

Question Title

3. Title (Required.)

Question Title

4. Email (Required.)

Question Title

5. Mobile Phone Number (Required.)

Question Title

6. DMG Contact (Required.)

Question Title

7. Dietary Restrictions (Required.)

T