Location:
DMG Reno
1900 S McCarran Blvd #240
Reno, NV 89502
Date:
October 28, 2026
8 am - 3 pm
Cost: Free
The manufacturer’s guidelines for installing the piping and wiring systems connected to the indoor and outdoor LG Multi V air conditioning.
What We’re Covering:
Pre-Installation Considerations
Indoor & Outdoor Unit Overview
Heat Recovery
Refrigeration Piping
Wiring
Controls Overview
Pre-Commissioning