Lake Champlain Bridge
 

Lake Champlain Bridge Project

 
Public Survey Form on:
  • New bridge design concepts
  • Ways to commemorate the old bridge
Before completing the survey please check out the latest information on the bridge design options via this link This link will take you to handouts and concepts discussed at the public meetings.

1. Bridge features and design criteria Please check the three things that are most important to you related to the design of the new bridge. Add other criteria in the space provided below if you wish, but please check no more than three.

If you would like to add other criteria for consideration, please use the text boxes below.

2. Presented below are feasible bridge designs for the Lake Champlain crossing. Please read about them on the website then rate each of the images.

Steel girder

Image as described above

Please rate your preference for the Steel Girder bridge design.

Segmental Concrete

Image as described above

Please rate your preference for the Segmental Concrete bridge design.

Cable stayed

Image as described above

Please rate your preference for the Cable Stayed bridge design.

Concrete Extradosed

Image as described above

Please rate your preference for the Concrete Extradosed bridge design.

Tied Arch

Image as described above

Please rate your preference for the Tied Arch bridge design.

Modified Network Tied Arch Bridge

Image as described above

Please rate your preference for the Modified Network Tied Arch Bridge bridge design.

3. Please pick your top five preferred ways to commemorate the old bridge. Please just check up to 5 boxes.

If you would like to suggest other ways to commemorate the old bridge,please use the text boxes below.

If you have any additional comments please enter them here:

If you are not already receiving email updates about this project and would like to be included on our contact list, please enter your email address here: