The NCC will use the feedback from our member groups and other interested persons to draft a detailed response to the Planning System Review Issues Paper – The Way Ahead for Planning in NSW (“the Issues Paper”).
While the Issues Paper includes over 230 specific questions, this online survey seeks feedback on 40 general questions that target the key issues for our members and the environmental movement.
You do not need to complete every question. Each question is optional and answers can be submitted at any point in the survey by scrolling to the bottom and clicking 'done'.
We appreciate the time you take to provide your views and comments on your experiences of the NSW planning system.
NCC also encourages members of the community to visit the NSW Planning System Review website to download and read the Issues Paper and to consider making an individual submission directly to the Planning System Review by:
- Completing the submissions form on the Planning System Review Website: http://planningreview.nsw.gov.au/ or
- Posting your submission to the NSW Planning System Review, GPO Box 39, Sydney NSW 2001
Submissions will be accepted until midnight, Friday 17 February 2012.
We suggest you prepare your answers to this survey in a word document and then ‘cut and paste’ the answers into our online survey answer boxes. Your prepared answers can then be edited to form part of your individual submission that can be uploaded on the Planning system Review website. This survey contains cross references to the Issues Paper by identifying corresponding questions (for example [A1] refers to Question A1 of the Issues Paper.
Should you have any questions or concerns regarding the NCC Planning System Review Online Survey or the NSW Planning System Review, please do not hesitate to contact the NCC’s Planning Policy Officer, Cerin Loane on 9516 1488 or cloane@nccnsw.org.au
Currently, there are no objectives in the Act to guide how processes are to occur. One idea put forward was that there should be specific ‘procedural’ objectives that would set a framework for the operation of a new planning system, for example, objectives such as transparency, due process and simplicity and procedural objectives such as the right to be heard, the right to have open and accessible determination processes and the right to be given reasons for decisions.
Regional strategic planning aims to anticipate development patterns of a region. Regional strategic planning can address issues such as how to protect biodiversity and ecosystems, where to create employment to make travel times shorter and what community infrastructure to provide to create transport, health and education facilities for healthy, liveable settlement patterns.
Through strategic planning regions can be considered holistically, rather than in an ad hoc manner. This leads to better protection of biodiversity and ecosystems and allows for assessment of cumulative impacts.
The Department of Planning and Infrastructure has developed Regional Strategies for eight areas of regional NSW in partnership with state and local government, communities and business.
While Regional Strategies are useful in setting a clear direction for future growth in regional areas they have not been developed in a legislative framework that requires community consultation and, unlike local environmental plans, are not legally enforceable.
State Environmental Planning Policies (SEPPs)
State environment planning policies (SEPPs) are environmental planning instruments prepared by the Minister for Planning and the Department of Planning and Infrastructure. SEPPs can apply to the entire State or to specified land. SEPPs can override the provisions of other environmental planning instruments. There is no mandatory requirement for public participation for the preparation of SEPPs - community consultation is at the discretion of the Minister.
Local Environment Plans (LEPs)
Local Environment Plans apply to either the whole, or part of, a local government area. LEPs govern local development by dividing areas into "zones", such as rural, residential, industrial, recreational, open space, environment protection and business zones and specifying the types of development that are permissible, permissible with consent or prohibited in each zone.
The process for making LEPs changed from 1 July 2009. LEPs that were proposed after this date follow the new ‘gateway’ process. A comprehensive explanation of the LEP making process is contained in the EDO Fact Sheet 2.1 which is available at: www.edo.org.au/edonsw/site/factsh/fs02_1_3a.php
Some key features of the ‘gateway’ process:
- Preparation of any environmental studies is at the Minister’s discretion
- Consultation with State and Commonwealth agencies is at the Minister’s discretion
- Community consultation is at the Minister’s discretion and is only at the preliminary stage – there is no mechanism for community consultation at the later stages of preparation.
- The Minister can decide whether a public hearing will be held.
One concern raised during the initial submission period related to planning proposals for changes to zoning of land, in particular ‘spot rezoning’ which is usually in support of a particular development.
Environmental Impact Assessment
An issue that concerned both the community and some stakeholders during the initial stages of the Planning System Review was the reliability and validity of the information contained in environmental impact statements and assessment reports supplied by an applicant. A broad philosophical concern raised was that consultants hired by a proponent could never provide completely fearless and independent commentary.
Public participation in the development assessment process
Additional comments on development assessment
Planning Assessment Commission (PAC)
The NSW Planning Assessment Commission (PAC) began operation in November 2008. Its functions are to determine project applications as delegated by the Minister for Planning and provide advice to the Minister on a range of planning and development matters. The Issues Paper raised a series of questions with respect to the operation of the PAC [Issues Paper D65-D69].
Joint Regional Planning Panels (JRPPs)
Joint Regional Planning Panels (JRPPs) were established with the main function of determining regionally significant development applications. They also have other minor functions such as acting as the relevant planning authority for the purpose of preparing a local environmental plan when appointed to do so by the Minister for Planning. They can also provide advice on planning or development matters when requested to do so by the Minister. The Issues Paper raised a series of questions with respect to the operation of the PAC [Issues Paper D70-D80].
ACCOUNTABILITY AND MERITS REVIEW
Currently any person who makes a submission objecting to a development application for designated development is, in the event the development application is approved, entitled to bring a merits appeal in the Land and Environment Court within 28 days of receiving notification of the determination. These same objector appeal rights also exist with respect to decisions made by with Minister with respect to State significant development (SSD) and transitional Part 3A project determinations.
Objector appeals are not available:
- where the Planning Assessment Commission has held a public hearing
- for State significant infrastructure (SSI) applications; or
- for transitional Part 3A projects, the proponent is a public authority, it involves a critical infrastructure project, the Commission has reviewed the project or a concept plan has been approved.
The current planning legislation contains an ‘open standing’ provision which provides that any person may bring proceedings in the Court for an order to remedy or restrain a breach of this Act, whether or not any right of that person has been or may be infringed by or as a consequence of that breach. Any challenge to the legal validity of a development consent or complying development must be brought within 3 months of from the date on which public notice of the decision was given.
COMMUNITY CONSULTATION AND PUBLIC PARTICIPATION
The idea of public participation and community consultation is a common theme throughout the Issues Paper. Although questions are asked in relation to specific processes throughout the planning process, general questions are raised about improving community participation opportunities.
IMPLEMENTATION OF THE NEW PLANNING SYSTEM