| Apply non-slip coating to North path steps | | | | | | | |
|---|
| Apply non-slip coating to South path metal plates (located after towers) | | | | | | | |
|---|
| Allow cyclist access to both North and South paths | | | | | | | |
|---|
| Re-pave Manhattan side South pathway & neckdown; consistently maintain roadway to remain free of debris, potholes, and cracks | | | | | | | |
|---|
| Install clear signage on path to designate clearly separate cyclist & pedestrian paths | | | | | | | |
|---|
| Reposition mirrors around towers to eliminate blind spots UPDATE: T.A. got this DONE! | | | | | | | |
|---|
| Provide 24 hour bridge access for pedestrians and cyclists | | | | | | | |
|---|