| Per site (a flat fee for everything) | | | | | | | | |
|---|
| Per site and per operator (charged for each operator and each site) | | | | | | | | |
|---|
| Per operator (so 1 operator can be used across multiple sites) | | | | | | | | |
|---|
| For a site and operator allowance (eg up to 10 sites and 10 operators) | | | | | | | | |
|---|
| For an operator allowance (eg up to 10 operators across multiple sites) | | | | | | | | |
|---|