Macomb County Trail Update 2009
Exit this survey
1. Default Section
*
1
. Please answer the following questions.
Please answer the following questions.
Name:
Municipality:
Address:
Address 2:
City/Town:
State: Michigan
-- select state --
AL Alabama
AK Alaska
AS American Samoa
AZ Arizona
AR Arkansas
CA California
CO Colorado
CT Connecticut
DE Delaware
DC District of Columbia
FM Federated States of Micronesia
FL Florida
GA Georgia
GU Guam
HI Hawaii
ID Idaho
IL Illinois
IN Indiana
IA Iowa
KS Kansas
KY Kentucky
LA Louisiana
ME Maine
MH Marshall Islands
MD Maryland
MA Massachusetts
MI Michigan
MN Minnesota
MS Mississippi
MO Missouri
MT Montana
NE Nebraska
NV Nevada
NH New Hampshire
NJ New Jersey
NM New Mexico
NY New York
NC North Carolina
ND North Dakota
MP Northern Mariana Islands
OH Ohio
OK Oklahoma
OR Oregon
PW Palau
PA Pennsylvania
PR Puerto Rico
RI Rhode Island
SC South Carolina
SD South Dakota
TN Tennessee
TX Texas
UT Utah
VT Vermont
VI Virgin Islands
VA Virginia
WA Washington
WV West Virginia
WI Wisconsin
WY Wyoming
ZIP/Postal Code:
Email Address:
Phone Number:
2
. Has the municipality made any additions or alterations of trail locations since the printing of the 2004 Macomb County Trailways Master Plan?
Has the municipality made any additions or alterations of trail locations since the printing of the 2004 Macomb County Trailways Master Plan?
Yes
No
3
. If there has been changes since 2004 have they been included as a section in the municipality's recreation plan?
If there has been changes since 2004 have they been included as a section in the municipality's recreation plan?
Yes
No
4
. How many years has it been since you have updated your municipality's recreation plan?
How many years has it been since you have updated your municipality's recreation plan?
One Year
Two Years
Three Years
Four Years
Five Years
Additional Comments
5
. Please review the 2008 aerial and trail network that is the last compilation of data supplied by the municipalities to The Macomb County Planning and Economic Development Department. Does the trail network adequately reflect existing plans of the municipality (Be sure to look at whether the trail is built or proposed and look to see if it has the correct surface symbology)?
Please review the 2008 aerial and trail network that is the last compilation of data supplied by the municipalities to The Macomb County Planning and Economic Development Department. Does the trail network adequately reflect existing plans of the municipality (Be sure to look at whether the trail is built or proposed and look to see if it has the correct surface symbology)?
Yes
No
*
6
. Please review the aerial and trail network. Please list any trails not shown and include in the text box whether they are constructed or proposed. Also list which side of the road the trail is located and the extents of the entire trail. Example: 18 Mile Trail from Hayes East to Garfield. Trail is on the south side of the road right-a-way.
Please review the aerial and trail network. Please list any trails not shown and include in the text box whether they are constructed or proposed. Also list which side of the road the trail is located and the extents of the entire trail. Example: 18 Mile Trail from Hayes East to Garfield. Trail is on the south side of the road right-a-way.
*
7
. Please review the 2008 aerial and trail network for your community. If the trail network is displaying an incorrect surface type for a trail or trails, please list each trail and provide the correct surface type. Trails that have no distinct name can be referenced by intersection or by the road name that the trail parallels. See example from last question.
Please review the 2008 aerial and trail network for your community. If the trail network is displaying an incorrect surface type for a trail or trails, please list each trail and provide the correct surface type. Trails that have no distinct name can be referenced by intersection or by the road name that the trail parallels. See example from last question.
*
8
. Are there any small distances in your community that a trail user could use sidewalk to bridge a gap from one trail segment to another (This particular question is determined to find areas where a small section of sidewalk will connect two major trail portions. It is not intended to provide an exhaustive list of how all the current trails constructed could be networked with the use of sidewalks.)?
Are there any small distances in your community that a trail user could use sidewalk to bridge a gap from one trail segment to another (This particular question is determined to find areas where a small section of sidewalk will connect two major trail portions. It is not intended to provide an exhaustive list of how all the current trails constructed could be networked with the use of sidewalks.)?
Yes
No
9
. If there are areas that can be connected by sidewalk, please list the road location and the starting and ending point and include the two major trail segments that the sidewalk will connect.
If there are areas that can be connected by sidewalk, please list the road location and the starting and ending point and include the two major trail segments that the sidewalk will connect.
Survey Powered by:
SurveyMonkey.com
"Surveys Made Simple."
Javascript is required for this site to function, please enable.